Case Study
Glycol Chiller Project – Ambrosia Creamery, Lifton
Overview
Client: Ambrosia Creamery (Premier Foods)
Industry: Food Manufacturing
Presence: Design, supply, installation, and commissioning of a new 1.1 MW glycol chiller system
Project Overview: Penmann Climatic Systems Ltd delivered a permanent 1.1 MW glycol chiller system for Ambrosia Creamery in Lifton on behalf of Premier Foods, replacing temporary hire units with a high-capacity, energy-efficient solution designed for food manufacturing operations. The project improved reliability, cooling performance, and future expansion capability through the design, supply, installation, and commissioning of a Daikin glycol chiller system aligned with long-term operational and environmental goals.
Project Value Range: £450,000
Penmann Climatic Systems Ltd was appointed by Premier Foods to deliver a permanent glycol chiller solution for the Ambrosia Creamery site in Lifton. The new system was designed to replace two temporary hire units and to improve overall site efficiency, reliability, and cooling performance. The project scope included the design, supply, and installation of a 1.1 MW Daikin glycol chiller, complete with associated pipework, pump skid, electrical controls, and commissioning. The installation was designed to meet the site’s existing cooling demand with built-in future capacity for process expansion.
Project Objectives
The key objectives of the Glycol Chiller Improvements Projects were to:
- Eliminate the use of temporary hire equipment and introduce a permanent, energy-efficient system.
- Increase system capacity to meet both current and future process requirements.
- Integrate seamlessly with existing glycol storage and secondary systems.
- Improve long-term reliability and simplify ongoing maintenance.
- Provide precise temperature control for both process and comfort cooling loads.
- Maintain sound emissions below 110 dB(A) when measured at 1 metre from the unit.
The new chiller was designed to achieve glycol temperatures of -1°C flow and +4°C return, using a 20% mono propylene glycol mix as the cooling medium.
Design & Equipment
The selected system centred around a Daikin EWAHC15TZ air-cooled chiller, delivering 1,142 kW of cooling capacity at -1°C and 1,375 kW at +5°C. Operating with R1234ze refrigerant (GWP = 7), the system provided a sustainable, low-carbon solution aligned with Premier Foods’ environmental objectives.
The chiller featured variable-speed compressors and achieved an IPLV efficiency of 5.07 kW/kW, ensuring strong performance under part-load conditions. The total system footprint was contained within the existing plinth dimensions of 13.2m x 4.5m x 5m (H).
A 2,500-litre buffer vessel, glycol pressurisation unit, and new pump skid were also included, all designed and built to deliver efficient hydraulic performance while maintaining accessibility for servicing.
Mechanical Installation
During the initial site shutdown, the existing glycol tank was drained into six 1,000-litre IBC containers to allow safe connection to the new system. The reclaimed glycol was re-used following installation. A new pump skid was installed beneath the tank, incorporating stainless steel suction and discharge headers, isolation valves, strainers, and instrumentation. This configuration maximised the Net Positive Suction Head (NPSH) to each pump, improving flow rates, operating efficiency, and pump longevity.
Pipework was fabricated from thin-wall 304-grade stainless steel and installed at a height of 2.5 metres across the mezzanine to maintain personnel access. The flow and return pipework were routed externally through the factory wall to connect with the chiller evaporator, using steel supports fixed to the building framework.
All pipework was insulated with 50 mm phenolic foam and finished in 0.7 mm stucco aluminium cladding, with Velcro mat covers fitted to valves and flanges for ease of maintenance.
Electrical Installation and Controls
A new pump control panel was manufactured and installed to serve four 15 kW chilled-water pumps, two of which were connected initially, leaving capacity for future expansion. The panel was constructed from mild steel, rated to IP55, and powder coated to RAL 7035.
Key features included:
- Door-interlocked isolator and individual circuit protection.
- Controls transformers, relays, and timers for automatic operation.
- LED status indicators for pump and chiller operation.
- Hand/Off/Auto (H/O/A) switches and duty selection controls.
- IP66-rated Variable Speed Drives (VSDs) to optimise pump performance.
New power and control cabling was installed from the control panel to the pumps and chiller, using galvanised tray containment and XLPE/SWA/LSF cables with compression glands and brass terminations. The system was designed in accordance with BS 7671:2018 (18th Edition Wiring Regulations) and tested prior to handover. Following successful testing, Penmann’s service engineers commissioned the pumps and chiller, completing full performance validation and handover documentation.
Although BMS integration was outside the project scope, Penmann installed containment and cabling provisions to allow connection of the chiller communication card to the site-wide system in the future.
Chiller Installation
The Daikin chiller was delivered to site on a flatbed vehicle and offloaded adjacent to the existing Trane unit using a crane. The unit was then skated into position beneath the site canopy and mounted on 25 mm spring anti-vibration mounts. Installation sequencing was carefully coordinated to minimise site disruption. Pipework connections were made to the evaporator inlet and outlet using PN16 butterfly valves, metering stations, strainers, and test points for commissioning and maintenance access.
Project Programme
Penmann’s delivery schedule was planned to align with Ambrosia’s production requirements, with an order-to-handover window of approximately 20 weeks:
- Weeks 1–2: Order confirmation and design approval
- Weeks 3–6: Chiller procurement and drawing completion
- Weeks 12–14: Fabrication of pump skid and commencement of installation
- Week 17: Chiller delivery and installation
- Week 19: Practical completion
- Week 20: Commissioning and handover
The project achieved completion in August 2023.
Project Outcome
The installation of the new glycol chiller system provided Ambrosia Creamery with a permanent, efficient, and environmentally sustainable cooling solution. The system replaced temporary hire units with a robust installation that met the site’s current process demands while offering flexibility for future expansion.
By adopting R1234ze refrigerant and variable-speed compressor technology, the project achieved significant energy and carbon savings compared to older systems. The integration-ready controls and efficient hydraulic design delivered long-term reliability, ease of maintenance, and improved overall site efficiency.
The project demonstrates Penmann’s continued expertise in delivering turnkey chiller and process cooling solutions for the UK food manufacturing sector, combining technical precision with sustainable design.